Our Recent Projects 

Project: Cooroy 2 Curra Stage 2

Client: Bielby Hull Joint Venture

Project Duration: 3 Years

Scope of Works: JR Earthmoving was awarded the drainage subcontract. for C2C Stage 2. The scope of works included installation of RCP’s ranging from 375DN to 2100DN with 400+ cast-insitu gully pits and manholes constructed

Project: Amrun Project, Weipa

Client: QHM Birt, Rio Tinto

Project Duration: 6 months

Scope of Works: A new 35km road alignment construction into the Amrun Rio Tinto mine in Weipa was awarded to the principal QBirt. JR Earthmoving was awarded the drainage subcontract to install 35 culvert lines of corrugated Iron drainage pipes.

The scope of works included installation of RCP’s ranging from 500DN to 1500DN. 

Project: Rocklea to Darra, Ipswich Motorway Upgrade

Client: Bielby Hull Joint Venture

Project Duration: 4 years

Scope of Works: R2D being delivered by the principal BHJV for BCC and TMR. JR Earthmoving was awarded the drainage subcontract. JR was also engaged for Plant and Labour Hire.

Project: PUP Installation, Sunshine Coast Airport

Client: Dormway Holdings

Project Duration: 4 months

Scope of Works: JR Earthmoving was engaged for wet plant hire for the installation of the PUP utilities for the second runway upgrade on the Sunshine Coast.

Project: Sports Drive to Gateway Motorway M1 Upgrade

Client: Bielby Holdings

Project Duration: 1 Year

Scope of Works: JR Earthmoving was engaged for general wet plant hire